RAIB recommends Freightliner improve train preparation processes after Washwood Heath near miss
The Rail Accident Investigation Branch has made one recommendation and two learning points after a ground staff operative examining a stationary train reached safety only seconds before a freight train passed.
The Rail Accident Investigation Branch (RAIB) has recommended that Freightliner Limited improve its processes for train preparation outside terminals and depots, after a ground staff operative at Washwood Heath, Birmingham, narrowly avoided being struck by a freight train.
RAIB published its report, numbered 13/2026, on 16 November 2026. It covers an incident on 18 September 2025 in which the driver of a freight train travelling at about 36 mph (58 km/h) on the Up Derby Slow line reported a near miss with a member of ground staff working next to the line.
What happened
According to RAIB's final report, the operative was carrying out a safety examination of a stationary train before it left the Up Washwood Heath Goods Loop. The approaching driver saw the operative standing between the stationary train and the open line and sounded the horn.
The operative acknowledged the warning and moved quickly towards the rear of the stationary train, RAIB said, but reached the rear wagon and a position of safety behind it only about four to five seconds before the freight train passed. Nobody was hurt and nothing was damaged, although RAIB said the freight train driver was shaken.
The final report gives the time as around 07:19. RAIB's initial announcement of the investigation, on 30 October 2025, put it at around 07:20 and described the staff member as a shunter engaged in shunting duties on the goods loop. The final report describes a ground staff operative undertaking a safety examination before departure.
Findings
RAIB found the operative was in an unsafe place when the train approached. The safety examination needed to be carried out outside the nearby freight terminal, and the operative did the work on the side of the train next to an open line without an appropriate safe system of work in place.
An underlying factor, RAIB said, was that Freightliner had not effectively managed the risk of carrying out this activity at this location.
RAIB also observed that the process for testing staff for drugs and alcohol after the incident, required by rail industry standards, was not followed.
Recommendation and learning points
RAIB made a single recommendation, addressed to Freightliner Limited, to improve its processes for undertaking train preparation activities outside terminals and depots.
It also issued two learning points for the wider industry. The first highlights the importance of reporting potentially unsafe conditions. The second reminds duty holders of the requirement to test staff involved in incidents for drugs and alcohol.
When it opened the investigation, RAIB said it would examine the local working instructions, how the risks of being on or near the line were being controlled, the roles, responsibilities and competence of relevant staff, and any underlying management or systemic factors. The October 2025 announcement was moved to the National Archives on 16 November 2026 once the report was published.
Context
RAIB says the sole purpose of its investigations is to prevent future accidents and incidents and improve railway safety. It does not establish blame or liability and does not prosecute; its Chief Inspector reports the outcomes of investigations to the Secretary of State for Transport.
The branch's annual report for 2025, signed by Chief Inspector of Rail Accidents Andrew Hall, notes that safety theory holds that a string of near misses will ultimately lead to an accident.
Report 13/2026 is RAIB's 13th full investigation report of the year. It follows Report 12/2026, on Bax user worked crossing, published on 9 November 2026.
Freightliner describes itself as the UK's largest maritime intermodal operator. The company said on 29 January 2026 that its acquisition by the CMA CGM Group had completed, and that it consisted of 10 terminals, about 1.4m rail slots and 2,000 wagons at that time.
The full report runs to 36 pages and is available from RAIB.
Sources
- Rail Accident Investigation Branch (GOV.UK) (opens in a new tab) (accessed 2026-11-16)
- Rail Accident Investigation Branch (GOV.UK) (opens in a new tab) (accessed 2026-11-16)
- Rail Accident Investigation Branch (GOV.UK) (opens in a new tab) (accessed 2026-11-16)
- Rail Accident Investigation Branch (GOV.UK) (opens in a new tab) (accessed 2026-11-16)
- Rail Accident Investigation Branch (GOV.UK) (opens in a new tab) (accessed 2026-11-16)
- Freightliner (opens in a new tab) (accessed 2026-11-16)
- Freightliner (opens in a new tab) (accessed 2026-11-16)
This story was researched from the primary sources above and checked against them before publication. Spotted an error? Tell us and we will correct it promptly.